Rechercher dans ce blog

Monday, June 21, 2021

Alstom to Equip 50 Vossloh Locomotives with Atlas On-Board Signalling Solution - railway-news.com

jaringankabar.blogspot.com

The Atlas ETCS Level 2 signalling solution deployed for Vossloh Locomotives is based on the latest Baseline 3 Release 2 standard. For Luxembourg lines, the locomotives will operate under ETCS Level 1 while the Contrôle de vitesse par balises software solution will be deployed on SNCF’s French freight network.

For their use in Belgium, the freight trains will be equipped with the additional Belgian Transmissie Baken-Locomotief or Transmission Balise-Locomotive (TBL1+) train control system. The three systems will then be integrated into Alstom’s Tri-Standard solution (TriStd).

To enable operation on the German rail network, Alstom’s Atlas solution will be used to integrate and manage the German Punktförmige Zugbeeinflussung (PZB) system. This solution will provide dynamic cross-border transition between these countries and can be extended to operate in the Netherlands, an option which has also been agreed upon.

Adblock test (Why?)



"equip" - Google News
June 21, 2021 at 08:32PM
https://ift.tt/35GeyNv

Alstom to Equip 50 Vossloh Locomotives with Atlas On-Board Signalling Solution - railway-news.com
"equip" - Google News
https://ift.tt/35zdBFR
https://ift.tt/3fgZnOp

No comments:

Post a Comment

Search

Featured Post

Comcast reluctantly agrees to stop its misleading “10G Network” claims - Ars Technica

Enlarge Comcast Comcast has reluctantly agreed to discontinue its "Xfinity 10G Network" brand name after losing an appeal of...

Postingan Populer